Post-Construction Cleaning Company in Riyadh

Post-Construction Cleaning Company in Riyadh

CleanUp (كلين آب) is a Riyadh-based post-construction and handover cleaning contractor, commercially registered in Saudi Arabia (CR 7052418410), working for main contractors, developers and fit-out contractors. The scope covers dust, paint, cement, plaster and silicone residue removal, floor scrubbing and mechanical polishing, doors, glass and aluminium tracks, bathroom descaling and the outdoor pavers and entrances, so the site is ready for snagging, the consultant's inspection and tenant handover. We work on purchase orders with ZATCA-compliant e-invoicing, run night shifts when the programme needs them, walk the site within 24 hours and quote within one business day. Call or WhatsApp +966 55 221 6689.

What does post-construction cleaning include?

Every line is written into the quotation against your bill of quantities and adjusted after the site walkthrough. The standard scope:

  • Residue removal: construction dust, paint, cement, plaster and silicone residue, and protective film on glass and aluminium.
  • Floors: floor scrubbing, tile stripping, acid wash where the surface allows it, and mechanical polishing of marble and porcelain.
  • Doors and glass: internal and external doors, glass, window frames and aluminium tracks.
  • Bathrooms: acid descaling and deep sanitisation of sanitary ware and surfaces.
  • External areas: pavers, curbs, ramps, boundary walls and entrances.

How do you remove cement, paint and silicone without damaging marble?

A strong acid on marble or granite leaves a dull, etched surface that only re-polishing can fix. We identify each surface first, use mechanical rotary scrubbing with pH-neutral solutions, and apply an acidic cleaner only on surfaces that tolerate it, after a test patch. The method is explained (in Arabic) in how to remove cement and paint residue safely and acid cleaning vs mechanical scrubbing for tiles.

How does a handover clean run, from site visit to completion certificate?

  1. Site visit and scope assessment: our technical surveyor walks the site within 24 hours to review drawings, inspect site conditions, assess access and define the exact square-metre boundaries.
  2. Detailed quotation and method statement: a formal itemised quotation with manpower schedules, machinery specifications, HSE precautions and the expected handover timeline.
  3. Execution and field supervision: crews mobilise with safety gear and equipment under an on-site supervisor who liaises directly with your site manager, PM or safety team.
  4. Handover inspection and sign-off: a joint room-by-room snag inspection with your consultant or client representative, ending in a signed completion certificate.

Book the clean after the wet finishes, doors, glass and fixtures are in and before the preliminary snag inspection; the sequencing is explained (in Arabic) in when to book post-construction cleaning on a project, and what the consultant looks for in what a snag list means in construction cleaning and how to pass the consultant's handover cleaning audit.

Do you work night shifts and on purchase orders?

Yes. Night-shift crews cover tight handover deadlines without disrupting your subcontractors during the day. Invoicing is ZATCA-compliant e-invoicing (VAT 314370765300003) on structured purchase orders, with vendor pre-qualification approvals and corporate credit terms for repeat contracts. A dedicated bilingual project coordinator coordinates access, tracks milestones and attends client walk-throughs.

What does post-construction cleaning cost in Riyadh?

We do not publish a rate per square metre. The price is set after the walkthrough and issued as a formal quotation with a bill of quantities within one business day; what moves it is area, finish and floor type, the amount of residue, work at height and the programme. CleanUp is not the cheapest option in Riyadh; we compete on handover quality. The factors are detailed (in Arabic) in what post-construction cleaning costs in Riyadh.

What do we need for a quotation?

ItemWhy it matters
Approximate area and number of floorsSets manpower and machinery hours
Finish and floor types (marble, porcelain, parquet, epoxy)Decides the solutions and scrubbing method
Location and site access hoursFixes the shift plan, day or night
Target handover dateFixes crew size and sequencing with other trades
Drawings or BOQ (PDF, Excel, CAD)Lets the quotation follow your bill of quantities line by line

How to request a quotation

Send the area, finish type, location and target handover date, with drawings or a BOQ if you have them. Call or WhatsApp +966 55 221 6689 (WhatsApp), email info@cleanupksa.com, or use the quotation form. Full contact details: contact CleanUp. Arabic version of this page: شركة تنظيف ما بعد البناء والتسليم في الرياض.

Frequently asked questions

Do you clean residential projects or only commercial ones?

Both: commercial and administrative buildings and residential compounds handed over by a contractor or developer, plus new villas and apartments before move-in under the two-phase move-in deep cleaning programme (Arabic page).

Does the quotation include machinery and consumables?

Yes. The quotation lists machinery specifications, consumables, manpower allocation and the timeline, so nothing is added later outside what was agreed.

What if the consultant raises snags during the inspection?

The final inspection is joint and room by room with your consultant or client representative; snags raised are closed before the completion certificate is signed.

Do you work outside Riyadh?

Riyadh is our base. We take projects in other Saudi cities; mention the city and handover date in your request so the schedule can be reviewed.

Related: Deep Cleaning Contractor in Riyadh · Office Cleaning Contracts in Riyadh · About CleanUp · all guides in the CleanUp blog.

Request a quotation from CleanUp

Post-construction, deep cleaning, office and hospitality contracts in Riyadh — call / WhatsApp 0552216689 — info@cleanupksa.com

بُني بـابني